Project: Voltar-S21   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Vern Little   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:2375.6
Start/Last Date:Mar 06, 2018 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=Voltar-S21

Home or Last Project Picture

Oct 23, 2023     Vertical Attachment - (3.5 hours)       Category: Tail Feathers
Attached Rudder to VS with AN-3 bolts and castellated nuts. Needed to ream the hinge bushings to 3/16” to get bolts to fit. See photo for my extension reamer setup. Used parts from an old hand-crank style deburring tool, a miniature threaded jacob's chuck from my angle-drill kit, and the reamer.

Tacked rubber VS fairing in place. It requires notching in a few locations. Needs to be pushed on firmly to ease installation of the VS. Only a few spots needs to be tack glued— once the VS is mounted, it clamps it in place.

Attached VS-Rudder assembly to aft fuselage, and pinned with required bolts. Also include the rudder stop. Pulled tailBeaconX wires through the snap bushings I had preinstalled in the VS. Working inside the tailcone with limited access is quite difficult!


 